Tri-State Tollway (I-294) Roadway Reconstruction & Widening (Flagg Creek to Hinsdale Oasis)
CLIENT
Illinois State Toll Highway Authority
LOCATION
I-294 Central Tri-State Corridor, Cook County, IL
SERVICES
Construction Management
SWE Solutions provided Construction Inspection services for the Illinois State Toll Highway Authority for the I-294 Central Tri-State Roadway Reconstruction and Widening. The following scopes are relevant example’s of SWE’s capabilities to work as a team to successfully deliver construction projects.
Interstate 294 (I-294) is a tolled auxiliary Interstate highway, serving as a bypass around the city of Chicago. The Central Tri-State Roadway Reconstruction and Widening from Flagg Creek to Hinsdale Oasis (MP 23.8 to MP 25.0) is a Phase III construction project consisting of the inspection and supervision of widening both north and south bound lanes, including the extension of the box culvert.
The project's scope of work included inspecting contractor’s daily activities:
Relocation of temporary light poles
Earth/structural excavation
Utility potholing
Box culvert tie reinforcement bars & wood framing
Drilling shaft for the noise wall foundation
Pavement removal
Trench drainage installation
Asphalt paving for roadway
Cofferdam installation for redirecting water flow
Installation of temporary drainage system
3D Modelling